Architect: Jacoby Architects
Location: Brigham City, UT
Completed: 2016
Size: 58,160 SF
Budget: $12,000,000
Delivery: Design-Bid-Build

UTAH STATE UNIVERSITY, BRIGHAM CITY ACADEMIC BUILDING

The X-structure of the building produced unique challenges to the power and communication distribution systems. Additional clash detection with cable trays and routing for accessibility were necessary to complete a satisfactory and organized infrastructure while meeting USU standards.


Designer: Envision Engineering
Location: Salt Lake City, UT
Completed: 2015
Size: U of U Lower Campus
Budget: $86,000,000
Delivery: Design-Bid-Build

UNIVERSITY OF UTAH, LOWER CAMPUS MEDIUM VOLTAGE DISTRIBUTION UPGRADE

The entire campus' electrical infrastructure had to be rebuilt while power continued to supply all buildings on campus. This required an extremely involved level of coordination both on the drawings and with the contractor during construction. Envision was able to accomplish this while minimizing the amount of work that had to be “redone” in the second phase of construction.

Envision worked with multiple stakeholders, including local electrical engineers Spectrum.


Architect: EDA Architects
Location: Salt Lake City, UT
Completed: 2016
Size: 160,000 SF
Budget: $36,576,500
Delivery: Design-Bid-Build

UNIVERSITY OF UTAH, PIERRE LASSONDE LIVING STUDIOS

[Pierre Lassonde description here...]