Envision has done 12 of the last 13 new or major remodel projects for the Davis School District since 2012.

davis logo large.png

Davis SD Jr. High Prototype, TBD
Davis SD Sunset Jr. High Rebuild, Sunset, UT, TBD
Davis SD Mueller Park Junior High School Remodel, Bountiful, UT, 2018
Davis SD Junior High School #17, West Layton, UT, 2019 (Zero Energy Ready)
Davis SD West Bountiful Elementary Rebuild, Bountiful, UT, 2020 (Zero Energy Ready)
Davis SD Mountain High Addition and Remodel, Kaysville, UT, 2019
Davis SD Bus Maintenance Plaza, Farmington, UT, 2019
Davis SD Woods Cross High School Remodel Phase I & II, Woods Cross, UT, 2018
Davis SD Farmington High School, Farmington, UT, 2018 (Zero Energy Ready)
Davis SD Kay’s Creek Elementary, Kaysville, UT, 2016 (Zero Energy)
Davis SD Canyon Creek Elementary, Farmington, UT, 2016 (Zero Energy)
Davis SD Odyssey Elementary Zero Energy Prototype, Woods Cross, UT, 2014


Architect: VCBO Architects
Location: Farmington, UT
Completed: 2018
Size: 405,000 SF
Costs: $75,755,071
Delivery: Design-Bid-Build

DAVIS SCHOOL DISTRICT, Farmington high school

In terms of sheer size, this massive flexible-classroom high school will finish at just over 400,000 SF. The front of the building will be wider than 2.5 linear football fields. The facility is technologically advanced, with a robust wireless framework to support connections to the Internet and classroom TV usage. A lecture capture system is possible, capturing the live classroom instruction and streaming for student review or in the event of absence. This building is also net-zero ready.

Designer: VCBO Architects
Location: Farmington, UT
Completed: 2016
Size: 85,000 SF
Budget: ~$16,000,000
Delivery: Design-Bid-Build

DAVIS SCHOOL DISTRICT, CANYON CREEK ELEMENTARY SCHOOL

This elementary school, along with Kay's Creek Elementary, were both copies of the original Davis School District flagship net-zero prototype, Odyssey Elementary (2014). Both Canyon Creek and Kay's Creek have solar panels installed. This model has become the new standard and base for the District's future elementary builds.


Designer: MHTN Architects
Location: Bountiful, UT
Completed: 2019
Size: 60,000 SF
Budget: $14,700,000
Delivery: Design-Bid-Build

Davis SCHOOL DISTRICT, West Bountiful Elementary SCHOOL Rebuild

The West Bountiful rebuild sits on a challenging site. Site rebuild experience was a determining factor in the design team selection. On the outside, the new school will have much better access from the adjacent streets. On the inside, flexible learning with a pursuit of smaller learning communities, a robust wireless network, and state-of-the-art classroom technology. This school will become the District's 4th zero-energy elementary building.

 

davis SCHOOL DISTRICT, new junior high school #17

The District welcomes the new junior high school to meet a growing student population in Davis County. The design was initially based on the Centennial Junior High School model built within the District in 2012. It welcomes many improvements, lighting innovations and technological advancements for modern and flexible learning areas. Like other new construction K-12 buildings within the District, the building is a net-zero ready facility.

Architect: VCBO Architects
Location: West Layton, UT
Completed: 2018
Size: 202,000 SF
Budget: $
Delivery: Design-Bid-Build


DAVIS SCHOOL DISTRICT, Woods Cross hs addition/Remodel

Broken up into two phases, two-thirds of the high school was renovated including the additions of a new science suite, admin office suite, and a new counseling and career center. The kitchen, cafeteria and media center were relocated for improved space utilization on campus. The auditorium was also refurbished. Along with the renovations and additions, the entire school’s fire alarm and intercom systems were upgraded.

Architect: GSBS Architects
Location: Woods Cross, UT
Completed: 2018
Size: 299,231
Budget: $13,250,000
Delivery: Design-Bid-Build


CANYONS SCHOOL DISTRICT, ALTA high school REMODEL PHASE I

Alta High School’s Phase I Remodel added four new classrooms (replacing a large open body shop), remodeled a large weight room, and finished a new dance floor for its 2400 students grades 10 through 12. The front entrance to the building was also upgraded with a new finish and new lighting.

Architect: VCBO Architects
Location: Sandy, UT
Completed: 2014
Size: 29,000 SF
Budget: $4,197,736
Delivery: Design-Bid-Build


Seeking a tailored resume from us for a K-12 project? Let us know! We're available and happy to help.