Architect: MHTN Architects
Location: Grantsville, UT
Completed: 2012
Size: 66,300 SF
Budget: $10,055,534
Delivery: Design-Bid-Build

TOOELE SCHOOL DISTRICT, GRANTSVILLE ELEMENTARY REPLACEMENT

The new elementary school replaced the existing Grantsville Elementary that was damaged due to a fire. Extensive site investigations and utility coordination were necessary to insure all existing utilities where removed and or relocated to minimize the work on the new site.


davis SCHOOL DISTRICT, new junior high school #17

The District welcomes the new junior high school to meet a growing student population in Davis County. The design was initially based on the Centennial Junior High School model built within the District in 2012. It welcomes many improvements, lighting innovations and technological advancements for modern and flexible learning areas. Like other new construction K-12 buildings within the District, the building is a net-zero ready facility.

Architect: VCBO Architects
Location: West Layton, UT
Completed: 2018
Size: 202,000 SF
Budget: $
Delivery: Design-Bid-Build


Architect: FFKR Architects
Location: Provo, UT
Completed: 2018
Size: 290,500 SF
Budget: $68,525,000
Delivery: Design-Bid-Build

PROVO SCHOOL DISTRICT, PROVO HIGH SCHOOL REBUILD

The Provo High School Rebuild is part of a series of new construction facilities funded from a $108M bond passed in late 2014. The existing high school, over 50 years old, will be replaced with nearly 300,000 SF of new classroom and support spaces, and an additional 40,000 SF of gymnasium that will undergo a remodel and maintain its function.


PROVO SCHOOL DISTRICT, Edgemont & PROVOST Elementary Rebuilds

These two schools, adapted from the North Ogden Elementary plan, were updated to replace the old and outdated original Edgemont and Provost builds. The facilities were brought up to current educational and building code standards with high energy modeling and efficiency.

Architect: MHTN Architects
Location: Provo, UT
Completed: 2016 / 2017
Size: 71,561 SF / 63,560 SF
Budget: $14.5M / $14.1M
Delivery: Design-Bid-Build


TOOELE SCHOOL DISTRICT, Sterling & old mill elementaries

These two new elementary schools were repeats of the Grantsville Elementary Rebuild, which Envision also designed with MHTN Architects. While Sterling Elementary was a replacement building, Old Mill was a brand new build to serve the growing population.

Architect: MHTN Architects
Location: Grantsville, UT
Completed: 2016
Size: 68,875 SF
Delivery: Design-Bid-Build


JORDAN SCHOOL DISTRICT, CREEKSIDE MIDDLE school

This high-efficiency middle school is a new building for the District's increasing student population size with the growth of Daybreak. It features daylight harvesting, lighting controls, and energy efficient fixtures. 

Architect: VCBO Architects
Location: South Jordan, UT
Completed: 2019
Size: 175,000 SF
Budget: $32,000,000
Delivery: Design-Bid-Build


DAVIS SCHOOL DISTRICT, Farmington high school

In terms of sheer size, this massive flexible-classroom high school will finish at just over 400,000 SF. The front of the building will be wider than 2.5 linear football fields. The facility is technologically advanced, with a robust wireless framework to support connections to the Internet and classroom TV usage. A lecture capture system is possible, capturing the live classroom instruction and streaming for student review or in the event of absense. This building is also net-zero ready.

Architect: VCBO Architects
Location: Farmington, UT
Completed: 2018
Size: 405,000 SF
Costs: $75,755,071
Delivery: Design-Bid-Build


park city SCHOOL DISTRICT, park city high school expansion

This project is a large remodel and addition planned for the existing Park City High School. It will add classroom space, athletic space, CTE, choir and band space, and bring the building up to current building and energy code standards. Lighting and lighting controls will also be updated for maximized energy efficiency. This project is currently on-hold as PCSD is completing a district-wide security upgrade first.

Architect: VCBO Architects
Location: Park City, UT
Completed: TBD
Size: TBD
Budget: ~$60,000,000
Delivery: Design-Bid-Build


CANYONS SCHOOL DISTRICT, ALTA high school REMODEL PHASE I

Alta High School’s Phase I Remodel added four new classrooms (replacing a large open body shop), remodeled a large weight room, and finished a new dance floor for its 2400 students grades 10 through 12. The front entrance to the building was also upgraded with a new finish and new lighting.

Architect: VCBO Architects
Location: Sandy, UT
Completed: 2014
Size: 29,000 SF
Budget: $4,197,736
Delivery: Design-Bid-Build